Skip to product information
1 of 13

WELLFOR 64" x 36" Bathroom Medicine Cabinet with Mirror, Anodized Chrome Aluminum Frame, Surface Mount or Recessed Medicine Cabinet with Mirror, Bathroom Mirror with Storage, Three Doors

WELLFOR 64" x 36" Bathroom Medicine Cabinet with Mirror, Anodized Chrome Aluminum Frame, Surface Mount or Recessed Medicine Cabinet with Mirror, Bathroom Mirror with Storage, Three Doors

Quantity
Regular price $1,439.98
Regular price Sale price $1,439.98
Sale Sold out
  • 24/7 Customer Support
  • Risk-Free 30-Day Returns
  • Fast & Reliable U.S. Shipping

30-Day Hassle-Free Returns

Not satisfied? Return your order within 30 days for a full refund or exchange — simple and easy.

✔ Easy return process

✔ Fast refunds

✔ No hidden conditions

Fast U.S. Shipping

We ship within the United States only — no international delays.

✔ Processing time: 1–2 business days

✔ Delivery time: 3–7 business days

✔ Real-time tracking available

👉 Track your order anytime from the header via Track Order

About This

  • Product Dimension - This set includes three mirrored cabinets — two 24"x36" and one 16"x36" — combining into a spacious 64"x36" wall-mounted unit. This mirror cabinet is shipped in THREE packages and requires simple assembly.
  • Wall-mount dimensions: W 64" × H 36" × D 4.81". Recessed dimensions: W 63.5" × H 35.5" × D 3.81". To ensure the best fit, PLEASE check and confirm the size before purchase.
  • Anodized Chrome Aluminum - Crafted from premium anodized chrome aluminum, this bathroom medicine cabinet offers a sleek look with superior rust resistance and long-term durability.
  • Blum Soft-Close Hinges - Equipped with premium Blum hinges, the soft-close door design eliminates noise and ensures a smooth, quiet closing experience, while also enhancing the overall longevity and reliability of the cabinet.
  • 180° Reversible Door Installation - Designed with a 180° reversible mirror door, this mirror cabinet allows left or right opening for flexible installation and personalized convenience.
  • Adjustable Glass Shelves - Includes 9 ultra-clear adjustable glass shelves (8mm each), each supporting up to 35 lbs. Customize the height to fit your needs and keep your bathroom essentials perfectly organized.
  • Tri-View Glass Mirrors - With tri-view glass mirrors, this aluminum medicine cabinet offers a panoramic view that simplifies your grooming routine, giving you the perfect angle for shaving, makeup, or hairstyling with ease.
  • Surface or Recessed Mount - This medicine cabinet supports wall-mounted or recessed installation and includes a surface mount kit for convenience.
  • Easy Installation - This mirror cabinet is shipped in THREE packages and requires simple assembly. All necessary hardware and a clear installation manual are included in the package, making the setup quick and hassle-free.

Overview

  • Brand : WELLFOR
  • Color : Chrome Aluminum
  • Material : Aluminum
  • Recommended Uses For Product : Medicine, Toiletry
  • Product Dimensions : 4.81"D x 64"W x 36"H
View full details

Smart Bathroom Upgrades for Modern American Homes

Free Shipping
Free Shipping on Orders Over $99
Easy Returns
30-Day Hassle-Free Returns
Secure Payment
Secure & Encrypted Checkout
Customer Support
24/7 Customer Support

Why Homeowners Choose UpgradeBath

bathroom  
Powerful & Consistent Water Pressure
construction  
Easy DIY Installation – No Plumber Needed
bathtub  
Water-Saving Without Sacrificing Comfort
bloodtype  
Powerful Flush & Water Efficiency
light  
Soft LED Lighting for a Relaxing Atmosphere
cabin  
Soft, Absorbent & Everyday Comfort Essentials
bathroom  
Powerful & Consistent Water Pressure.
construction  
Easy DIY Installation – No Plumber Needed.
bathtub  
Water-Saving Without Sacrificing Comfort
bloodtype  
Powerful Flush & Water Efficiency
light  
Soft LED Lighting for a Relaxing Atmosphere
cabin  
Soft, Absorbent & Everyday Comfort Essentials
Advanced sealing technology ensures reliable performance every day.
Effortless control of water flow and temperature for maximum comfort.
Clean lines and a timeless look that instantly elevates your bathroom space.
Built to resist rust, stains, and daily wear for long-lasting beauty.

Upgrade Your Bathroom in Days, Not Months

compare   ━━ before & after
From outdated and worn spaces to modern, clean, and relaxing bathrooms — transform your daily routine with simple upgrades that make a real difference.
Home Value Improvement 90%
Daily Comfort Upgrade 95%

FAQ

Are your faucets and shower systems compatible with U.S. plumbing?
remove
add
Yes. All our faucets and shower systems are designed to fit standard U.S. plumbing for easy installation.
Can I install a bidet or toilet upgrade myself?
remove
add
Most bidet and toilet upgrades are DIY-friendly and come with clear instructions. No professional help is required in most cases.
Will upgrading my shower system improve water pressure?
remove
add
Yes. Our shower systems are engineered to enhance water flow, providing a stronger and more consistent pressure.
What type of bathroom lighting should I choose?
remove
add
We recommend soft, warm lighting for a relaxing atmosphere and bright LED lighting for mirrors and daily use..
How do I choose the right sink or vanity for my bathroom?
remove
add
Choose based on your space, storage needs, and style. Modern vanities offer both functionality and a clean aesthetic..
Is a full bathroom remodel worth it?
remove
add
Absolutely. A bathroom upgrade increases home value, improves daily comfort, and creates a modern living space.
Strategic Partner
Smartphone with email subscription interface on a table with a cup of coffee and plant.

Unlock Exclusive Offers

Be the first to know about new collections and exclusive offers.

Subscribe Now